Saturday, March 14, 2026
Portland.news

Latest news from Portland

Story of the Day

Lane Closures on I-5 and Major Delays Expected on 82nd Avenue Today

AuthorEditorial Team
Published
January 22, 2026/07:30 AM
Section
City
Lane Closures on I-5 and Major Delays Expected on 82nd Avenue Today
Source: Wikimedia Commons / Author: SounderBruce

Morning Commute Overview

Commuters in the Portland metro area should prepare for a mix of maintenance-related delays and ongoing construction projects this Thursday, January 22, 2026. While most major freeways are seeing typical morning volumes, several active work zones on I-5 and I-205, alongside significant street-level projects on 82nd Avenue, are expected to impact travel times throughout the day.

Interstate and Highway Alerts

  • I-5 Corridor: Travelers on I-5 should watch for a moving maintenance operation on the Fremont Bridge in the southbound direction. Additionally, lane closures are reported near the I-84 interchange, with the left lanes restricted in both northbound and southbound directions. Short-term overnight shoulder closures continue near SW Terwilliger Boulevard as crews install new RealTime signs.
  • I-405: A moving maintenance operation is active on the Fremont Bridge for both northbound and southbound travelers. Expect minor delays of under 20 minutes and be prepared to move over for worker safety.
  • I-205 & OR 99E: In the West Linn and Oregon City area, nighttime lane closures on OR 99E under the I-205 bridge are scheduled to continue through tonight. Commuters should also expect daytime flagging on Main Street and Clackamette Drive until 5:30 p.m., which may slow access to the Abernethy Bridge area.
  • US 30 (NW St. Helens Road): Periodic daytime lane closures remain in effect between NW Bridge Avenue and NW Kittridge Avenue for ongoing safety improvements and repaving.

Local Street Impacts

  • 82nd Avenue: As part of the "Building a Better 82nd" initiative, multiple work zones are active between NE Fremont Street and SE Raymond Street. One lane remains open in each direction, but heavy congestion is expected during peak hours. Specific work includes sidewalk improvements, signal installations, and traffic separator construction.
  • SW First Avenue: A closure remains in place on SW First Avenue north of SW Arthur to SW Sheridan following a previous water main break. Drivers are advised to detour via SW Fourth Avenue or SW Naito Parkway.
  • NE Glisan Street: Preliminary work for sidewalk corner reconstruction is beginning between NE 82nd and 92nd avenues. While major paving is slated for summer, expect minor disruptions as crews update curb ramps.

Public Transit and Notices

TriMet is hosting an in-person open house today, January 22, from 4:00 p.m. to 6:00 p.m. at the Tualatin Library. This session focuses on proposed 2026 service changes, which include potential cuts to 35 bus lines and adjustments to the MAX Green Line. Riders who use the Tualatin or West Linn transit corridors are encouraged to attend. For those traveling from the coast, the Tillamook County Transportation District has successfully reinstated its early morning Route 5 trip to Portland, providing a 4:55 a.m. connection to the Sunset Transit Center.

Safety Reminder

With active maintenance crews on the Fremont Bridge and 82nd Avenue, drivers are urged to remain vigilant. Obey all posted speed limits in work zones and watch for flaggers on local arterials like Main Street.